top of page

Amgen Dashboard

Project Initiation

Feb'7th 2017 - Mar'13th 2017

VWR International LLC

Project Charter

PROBLEM STATEMENT

Generate 2 Amgen Dashboards by extracting the data from SAP BEx, format and export them to powerpoint. This involves manual copying and pasting data from separate tabs which is time consuming and have quality issues.

OBJECTIVE

Primary Objective:

Reducing the manual process and increase the quality

Secondary Objective

  • To save time taken to process from 120 Min to 5 Min by implementing automation.

  • To develop a procedure for extracting the data from SAP BEx and format various sheet tabs in excel dashboard.

  • Export them to powerpoint. Quality check once the reports are generated.

  • To propose an alternate method that reduces the rework rate.

EXPECTED DELIVERABLES

Implementing Automation, will lower the rework and increase quality, through

  • Poka-yoke

  • Without adding additional resources,

  • Decrease time,

  • Lower human fault,

     If  achieved, the Amgen Dashboards could be produced with greater quality in very short time.

PROJECT SCOPE- IN SCOPE

In Scope:

Quality Management, Customer Service Satisfaction, Use of Automated tool,  Time Management, Associates who run Amgen Monthly dashboard

 

Out Scope:

Can only be used for Amgen dashboard

Project Planning

Work Break down Structure

Amgen.png
Project Launch for Execution

The Tool has been created on Microsoft Excel VBA. It has been incorporated with SAP BEx query and excel VBA. It needs to run, extract, format and populate the data for for the user specified time period. The QC mechanism is also incorporated successfully. It can also export data to powerpoint based on the requirements. If this is implemented successfully then the Turn Around Time for the stakeholder can be achieved without any issues on quality.

Project Performance And Control

The Tool has been created and it performs good. The user needs to open the template in BEx explorer and enter the time period in the desired cell and click "Start". When the button is clicked the tool runs, extracts the data from SAP and copies them to the respective sheet tabs and exports each tab into the powerpoint template with required formatting. The QC status can be checked whether the tool has run the report correctly. If the reports are ran correctly then it marks as "QC Passed" else  the tool marks "QC Failed"

Project Close
  • The official meeting with team members and management was conducted on Feb'7th 2017

  • The Project has Gone live after getting approval with IT on Mar'13th 2017

  • It saves time and increases the quality

bottom of page