top of page

Key Performance Indicator Generator

Project Initiation

Apr'12th 2016 - Aug'16th 2016

VWR International LLC

Project Charter

PROBLEM STATEMENT

Generate 450 KPI's every month by extracting the data from SAP BEx, format them in the desired template . This involves manual copying and pasting data from separate tabs which is time consuming and have quality issues.

OBJECTIVE

Primary Objective:

  • Reducing the manual process and increase the quality

  • To extract data from SAP without manual interventions

Secondary Objective

  • To save time taken to process from 4500 Min to 480 Min by implementing automation.

  • To develop a procedure for extracting the data from SAP BEx and format various sheet tabs in excel dashboard

  • Quality check once the reports are generated.

  • To propose an alternate method that reduces the rework rate

EXPECTED DELIVERABLES

Implementing Automation, will lower the rework and increase quality, through

  • Poka-yoke

  • To extract data from SAP without manual intervention,

  • Without adding additional resources,

  • Decrease time,

  • Lower human fault,

     If  achieved, the Monthly KPI's could be produced with greater quality in very short time.

PROJECT SCOPE- IN SCOPE

In Scope:

Quality Management, Customer Service Satisfaction, Use of Automated tool,  Time Management, Associates who run Monthly KPI's, If modified it can run Monthly Usage reports

Out Scope:

Can only be used for Monthly KPI reports

Project Planning

Work Break down Structure

Key Performance Indicator Gen_edited.png
Project Launch for Execution

The Tool has been created on Microsoft Excel VBA. It has been incorporated with SAP BEx query and excel VBA. It needs to run, extract, format and populate the data for  the user specified time period and usage template. The QC mechanism is also incorporated successfully. If this is implemented successfully then the Turn Around Time for the stakeholder can be achieved without any issues on quality

Project Performance And Control

The Tool has been created and it performs good. The user needs to open the template in BEx explorer and enter the time period in the desired cell and click "Start". When the button is clicked the tool runs, extracts the data from SAP and copies them to the respective sheet tabs and formats each tab based on requirements. The QC status can be checked whether the tool has run the report correctly. If the reports are ran correctly then it marks as "QC Passed" else  the tool marks "QC Failed"

Project Close
  • The official meeting with team members and management was conducted on Apr'12th 2016

  • The Project has Gone live after getting approval with IT on Aug'16th 2016

  • The Tool runs all the monthly KPI's for the month on a single click

  • It extracts data from SAP without manual interventions

  • It saves time and increases the quality

bottom of page