
Pall Monthly
Aug'29th 2018 - Sep'24th 2018
VWR International LLC
Project Charter
PROBLEM STATEMENT
Generate Pall Category management report every month by extracting the data from SAP BEx, format them in the desired template . This involves manual copying and pasting data from separate tabs which is time consuming and have quality issues.
OBJECTIVE
Primary Objective:
-
Reducing the manual process and increase the quality
Secondary Objective
-
To save time taken to process from 30 Min to 5 Min by implementing automation.
-
To develop a procedure for extracting the data from SAP BEx and format various sheet tabs in excel dashboard
-
Quality check once the reports are generated.
-
To propose an alternate method that reduces the rework rate
EXPECTED DELIVERABLES
Implementing Automation, will lower the rework and increase quality, through
-
Poka-yoke
-
Without adding additional resources,
-
Decrease time,
-
Lower human fault,
If achieved, CMR Pall Usage reports could be produced with greater quality in very short time.
PROJECT SCOPE- IN SCOPE
In Scope:
Quality Management, Customer Service Satisfaction, Use of Automated tool, Time Management, Associates who run CMR Pall Usage reports
Out Scope:
Can only be used for CMR Pall Usage reports
Work Break down Structure

The Tool has been created on Microsoft Excel VBA. It has been incorporated with SAP BEx query and excel VBA. It needs to run, extract, format and populate the data for the user specified time period. The QC mechanism is also incorporated successfully. If this is implemented successfully then the Turn Around Time for the stakeholder can be achieved without any issues on quality
The Tool has been created and it performs good. The user needs to open the template in BEx explorer and enter the time period in the desired cell and click "Start". When the button is clicked the tool runs, extracts the data from SAP and copies them to the respective sheet tabs and formats each tab based on requirements. The QC status can be checked whether the tool has run the report correctly. If the reports are ran correctly then it marks as "QC Passed" else the tool marks "QC Failed"
-
The official meeting with team members and management was conducted on Aug'29th 2018
-
The Project has Gone live after getting approval with IT on Sep'24th 2018
-
It saves time and increases the quality